14
RT-SVX073A-EN
Inspect all control panel components and tighten any
loose connections.
Connect properly sized and protected power supply
wiring to a field supplied/installed disconnect and the
unit (copper wiring only to the unit).
Verify that phasing to the unit is correct (ABC).
Turn the 1S1 fused switch inside the control panel off to
prevent accidental unit operation. Turn the 1S20 fused
switch inside the control panel on to power the
crankcase heaters.
Turn on power to the unit.
Verify that the controls remain powered off.
Verify that all compressor crankcase heaters are
energized for at least eight hours prior to unit start-up.
Important: All field-installed wiring must comply with NEC
and applicable local codes.
Gas Heat Units
Gas supply line properly sized and connected to the
unit gas train.
All gas piping joints properly sealed.
Drip leg installed in the gas piping near the unit.
Gas piping leak checked with a soap solution. If piping
connections to the unit are complete, do not pressurize
piping in excess of 0.50 psig or 14" W.C. to prevent
component failure.
Main supply gas pressure between 7" and 14" W.C.
Flue Tubes clear of any obstructions.
Factory-supplied flue assembly installed on the unit.
Connect the 3/4" CPVC furnace drain stub-out to a
proper condensate drain.
Install field provided heat tape to furnace drain line.
Hot Water Heat
Route properly sized water piping through the base of
the unit into the heating section.
Install the factory-supplied, 3-way modulating valve.
Complete the valve actuator wiring.
Steam Heat
Route properly sized steam piping through the base of
the unit into the heating section.
Install the factory-supplied, 2-way modulating valve.
Complete the valve actuator wiring.
Install 1/2", 15-degree swing check vacuum breaker(s)
at the top of each coil section. Vent breaker(s) to the
atmosphere or merge with return main at discharge
side of steam trap.
Position the steam trap discharge at least 12" below the
outlet connection on the coil.
Use float and thermostatic traps in the system, as
required by the application.
O/A Pressure Sensor and Tubing
Installation
O/A pressure sensor mounted to the roof bracket.
Factory supplied pneumatic tubing installed between
the O/A pressure sensor and the connector on the base
rail.
(Units with Relief/Return fans)Field supplied pneumatic
tubing connected to the proper fitting on the space
pressure transducer located in the return control panel,
and the other end routed to a suitable sensing location
within the controlled space.
Energy Recovery Wheel
Verify that the wheel turns freely though a full rotation.
Confirm that all wheel segments are fully engaged in
the wheel frame and that the segment retainers are
completely fastened.
Confirm the seal adjustment and proper belt tracking on
the wheel rim.