4. Installation
Careful consideration and time spent planning the boiler room and fuel store will
prevent delays when it comes to installing the system. It is recommended that a
survey of the plant room should be forwarded to TR Engineering Ltd for review so
they can advise the best solution for locating the boiler and fuel transport systems.
Contact your local TR Engineering Ltd Representative who will be happy to advise
what information the survey should contain.
4.1 Setting out the boiler location
The Greenflame system requires minimum clearances around the appliance for
servicing and maintenance. These are detailed in the figure below. A minimum of
600mm is required in front of the boiler in order to safely remove the ash pan from
the boiler or to clean the combustion chamber.
The boiler must be located on a non-combustible base that is capable of holding the
weight of the boiler when full (1700 kg)
14
250mm
300mm
750mm
400mm