EasyManua.ls Logo

Trianco GREENFLAME 55 - Unpacking

Trianco GREENFLAME 55
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.2 Unpacking
The TR Engineering Ltd Greenflame Pellet Boiler System is delivered in a single crate.
Remove the wooden crate, cardboard packaging, polystyrene packing, and bubble wrap
packaging and recycle in the appropriate manner.
The following items should accompany you Greenflame pellet boiler system :
Fillomatic Pellet Transport System
Pellet cyclone c/w door flap sensor.
40-65mm hose clamps to connect flow and return vacuum feed pipes.
Auger system either the Fillomatic standard auger or the Fillomatic floor track
system.
De-Ash Box
Boiler scraper tool
Burner scraper tool
A4 Manual pack
Installation and User Manual
Product Registration Card
Foil tape to blank de-ash outlet
Chimney pipe gasket
Hopper/Boiler fixing bolts x 2
Cable ties to tidy cable runs after installation.
15
In the unlikely event that an item is missing then your Agent should be notified within 5
working days in order to issue replacement parts. Missing or mislaid parts notified after
5 working days will incur a charge plus postal costs.
The following guidelines should be followed to ensure that the installation of the boiler
is carried out in a trouble free manner.
Be careful when moving or lifting the boiler as it is heavy
and could cause an injury. Use appropriate lifting
techniques and equipment for the individual weights of
these sections. Take all necessary precautions to prevent
damage to external casing.