10. Commissioning
Commissioning may only be carried out by TR Engineering Ltd authorised personnel.
The digital control panel shall remain locked until all pre-commissioning checks have
been carried out and the Commissioning Engineer. A pre-commissioning checklist must
be submitted by the installer to the Local Agent prior to a visit by the Commissioning
Engineer.
The Commissioning Engineer will carry out a series of checks on the installation and the
appliance prior to commissioning. Should the Engineer find that some installation items
remain outstanding or if there are items that may present a health and safety risk he may
decide to not commission the appliance until recommendations have been carries out.
The return visit by the commissioning by the Engineer will incur a call back charge. Your
local Agent will advise you of these charges.
Automatic De-Ash Models : Make sure that the foil tape
provided is attached to the inside of the de-ash box so that the
auger opening is covered. Failure to do so will lead to
inaccurate adjustment of draft and flue gas analysis.
Commissioning can be divided into 3 separate tasks :
1. Pre-commissioning checks
2. Start up check
3. Run mode check and flue gas analysis
52
Cover opening with foil tape