EasyManua.ls Logo

Trianco GREENFLAME 55 - Assembly

Trianco GREENFLAME 55
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.3 Assembly
The Greenflame is supplied fitted to it’s base permanent base for ease of lifting and
assembly. The Greenflame boiler is “plug and play” with just the connection of the flue,
hydraulic system and electrical system. The only items that need to be fitted to the
Greenflame are the ash box, exhaust fan housing and the pellet cyclone.
16
Commissioning of the Greenflame may only be
carried out by TR Engineering Ltd trained
personnel or their authorised representatives.

Related product manuals