EasyManua.ls Logo

triOS nanoFlu - Commissioning; Electrical Installation

triOS nanoFlu
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12 D01-060en202008 Manual nanoFlu
Use Calibration
Malfunction &
Maintenance
Introduction
General
Information
FAQTechnical Data Warranty
Customer
Service
Contact
Keyword
Index
Accessories
Commis-
sioning
Commissioning // nanoFlu
3 Commissioning
This chapter deals with the commissioning of the sensor. Please pay particular attention to this section and
follow the safety precautions to protect the sensor from damage and yourself from injury.
Before the sensor is put into operation, it is important to ensure that it is securely attached and all connections
are connected correctly.
3.1 Electrical Installation
3.1.1 SubConn 8-pin Connector
1. Ground (Power + Ser. Interface)
2. RS232 RX / RS485 A (commands)
3. RS232 TX / RS485 B (data)
4. Power (12...24 VDC)
5. ETH_RX-
6. ETH_TX-
7. ETH_RX+
8. ETH_TX+
Connect the male end of the connecting cable into the connector by making the pins align with the slots of the
cable.

Related product manuals