EasyManua.ls Logo

Triton Omnicare User Manual

Triton Omnicare
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
2181655A - March 2022
OMNICARE
SR pumped shower
INSTALLATION AND OPERATING INSTRUCTIONS
Please read this book thoroughly and familiarise yourself with all instructions before commencing
installation and keep it for future reference.
The shower installation MUST be carried out by a suitably qualified person, in the sequence of
this instruction book.
IMPORTANT SAFETY ADVICE
The shower unit MUST BE switched off at the
isolating switch when not in use. This is a
safety procedure recommended for all
electrical appliances.
The shower head and hose supplied with this
product are a safety critical part of your shower.
Failure to use genuine Triton parts may cause
injury and invalidate your guarantee.
FOR YOUR SERVICE REFERENCE
NOTE DOWN THE PRODUCT CODE BELOW
(FROM THE FRONT OR TOP OF THE BOX)
ALTERNATIVELY REGISTER BY TEL: 024 7637 8321
THIS OFFER IS NOT VALID OUTSIDE THE UK
REGISTER ONLINE
ENTER A PRIZE DRAW
WIN
£100
LOVE2SHOP VOUCHERS
VISIT OUR WEBSITE TODAY
TRITONSHOWERS.CO.UK/REGISTER
PRODUCT REGISTRATION IS ONLY AVAILABLE
TO UNITS PURCHASED & INSTALLED IN THE UK
! IMPORTANT !
Under *NO circumstances must this shower be connected directly
to a mains water supply. It is designed for GRAVITY FED
COLD WATER systems ONLY !
*Failure to comply may invalidate product warranty

Other manuals for Triton Omnicare

Questions and Answers:

Triton Omnicare Specifications

General IconGeneral
TypeElectric Shower
Temperature ControlThermostatic
Water Connection15mm compression
Start/Stop ButtonYes
MaterialPlastic
FinishWhite
Installation TypeWall Mounted
Warranty2 years
Water Entry PointsBottom
Cable Entry PointsBottom Entry
ApprovalsWRAS

Summary

Safety First

Important Safety Information

Essential safety warnings and operating precautions for the shower unit.

Introduction and Safety

General Guidance Notes

Plumbing Requirements

Compliance with regulations, pipe flushing, and connection standards for plumbing.

Electrical Requirements

Compliance with wiring regulations, earthing, RCD, and circuit protection standards.

Product Specifications

Installation Procedure

Plumbing and Positioning

Plumbing requirements and guidance on correct shower unit placement.

Electrical Installation

Detailed electrical requirements, cable sizing, and circuit protection.

Step-by-Step Installation Process

Detailed steps from positioning to commissioning the shower unit.

BEAB Care Setting

Procedure for setting the shower to meet BEAB Care mark specifications (41°C maximum).

Operating Instructions

Maintenance and Testing

Troubleshooting Guide

Common Faults and Solutions

Categorised list of common problems and their corresponding actions/solutions.

Commissioning and Testing Notes

UK Service Policy and Guarantee

Triton UK Standard Guarantee

Terms and conditions of the manufacturer's guarantee for the shower unit.

Related product manuals