EasyManua.ls Logo

turck FEN20-4IOL - Commissioning IO-Link V1.1 Devices

turck FEN20-4IOL
129 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
Commissioning an IO-Link device with IO-Link V1.1
24
Hans Turck GmbH & Co. KG | T +49 208 4952-0 | F +49 208 4952-264 | more@turck.com | www.turck.com
8.4 Commissioning an IO-Link device with IO-Link V1.1
The data storage of the master should be cleared before a device with a different device type is
connected to an IO-Link port which has already been used before.
The data storage memory of the master can be deleted in two ways:
n Reset the master to factory settings.
n Delete the data storage memory using the parameter Data storage mode.
Reset the master to factory settings via DTM
From the Factory settings drop-down menu, select Set to factory settings.
Load the parameter changes into the device.
a The DTM resets the device automatically.
Fig.19: Reset device to factory settings via DTM (example)
Connect the IO-Link V1.1 device.
a The LED IOL at the IO-Link port is green, IO-Link communication active.

Table of Contents

Related product manuals