12. Pull out the front part where the power supply and Control Board is attached.
13. There are now two possibilities:
•
Remove Power Supply and/or Control Board
•
See step 7 and 8 in section Dismantling the Control Box
NOTE: Remember to cable tie the energy eater cable to the power cable when
assembly the unit.
- Remove Energy Eater and/or Fan
See next step.
14. Remove the 4 nuts(7mm) on the Energy eater side and pull the individually part off the
screws(T20).
4.4.3. Torque Values
Torque values and notes for Control Box
Below are the torque values used in the Control Box.
Service Manual 57 e-Series
Copyright © 2009–2024 by UniversalRobotsA/S. All rights reserved.