7 Finishing installation
7.1 Uponor Smatrix Move
Make a complete check up of the installation:
1. Close the cover of the controller.
2. Set the controller to the defined operating settings.
3. Print and fill in the “Installation report” located at
the end of the manual.
4. Give the manual and all information about the
system to the user.
7.2 Uponor Smatrix Move PLUS
Make a complete check up of the installation:
1. Close the cover of the controller.
2. Set the controller and thermostat to the defined
operating settings.
3. Check that the thermostats are working correctly.
Turn thermostat set points to maximum to obtain a
heating demand and make sure that the actuators
are running.
4. Print and fill in the “Installation report” located at
the end of the manual.
5. Give the manual and all information about the
system to the user.
UK
CZ
DE
DK
EE
ES
FI
FR
HR
HU
IT
LT
LV
NL
NO
PL
PT
RO
RU
SE
SK
37
UPONOR SMATRIX MOVE/MOVE PLUS
·
INSTALLATION AND OPERATION MANUAL