EasyManua.ls Logo

Valor Fires 942 - Installer Guide; Table of Contents

Valor Fires 942
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CONTENTS
Section Page
INSTALLER GUIDE 4 - 46
OWNER GUIDE 47 - 59
1. SAFETY AND UNPACKING 7
2. APPLIANCE DATA AND EFFICIENCY 8
3. GENERAL INSTALLATION REQUIREMENTS 9
3.1 Regulations, Standards and Law. 9
3.2 Ventilation requirements. 10
3.3 The Atmosphere sensing device (ASD). 10
3.4 Fireguard requirements. 10
3.5 Room considerations. 10
3.6 Chimney preparation. 10
3.7 Fireplace preparation. 11
3.8 The hearth. 11
3.9 Fireplace clearances. 12
3.10 Installation options. 14
3.11 Flues. 16
3.12 Propane fires. 17
4. PACK CONTENTS 18
5. FIREPLACE CHECK 21
5.1 Soundness for appliance attachment. 21
5.2 Fireplace flue pull. 21
6. IGNITION CHECK 22
7. GAS SUPPLY CONNECTION 23
8. PREPARING APPLIANCE FOR INSTALLATION 24
9. HOTBOX INSTALLATION 26
9.1 Method 1 - Front fixing to fireplace surround. 26
9.2 Method 2 - Cable retention and floor fixing. 26
9.3 Sealing floor front - All installations 29
10. BURNER & SUPPLY PIPE INSTALLATION 30
10.1 Burner and supply pipe installation. 30
10.2 Preliminary burner checks. 30
10.3 Inlet pressure check. 31
Page 5
INSTALLER GUIDE
© Baxi Heating U.K. Limited 2009.
Continued on next page

Table of Contents

Related product manuals