Testing and Starting the System
Check the drain in the evaporator unit for any possible obstructions
Check all parts of the system for refrigerant leaks
Check the connections and attach the main wires to the system power
Turn system on checking high pressure for a minimum of 30 minutes, observe the cooling
performance and compare pressures to recommended usage (high pressure: 150 psi max,
after 30 minutes usage at 86F° outside)
Check the current draw of the total unit, evaporator blower, compressor, and condenser
fan and compare to assumed power draws maximums
Compressor
Condenser Fan
Evaporator Fan
55A (92A max)
13A (max)
8A (max)
Ensure all the components are tight and secure and the system operates without
excessive noise or vibrations
Feel electric terminals for excessive heat or loose connections
WARNING!
1
Ensure that the refrigerant hoses and wires are secured and tight to prevent any
rubbing against sharp objects or moving parts. Keep hoses and wires away from any
extreme heat source (>200F°) such as the exhaust system