5 Commissioning the Source Holder
5.1 Commission the Source Holder
Depending on the source holder type and the specific license requirements, the
process of commissioning the source holder can include:
Inspecting the mounting supports
Testing the source holder for any source material leakage
Conducting open and closed radiation surveys
Performing an occupancy evaluation
Commissioning Call Checklist
In many installations, a VEGA Americas Field Service Engineer commissions the
gauge. To reduce service time and costs, use this checklist to ensure the gauge is
ready for commissioning before the engineer arrives:
Allow access to the source holder for testing purposes.
Have process ready for adjustment.
To ensure the most accurate measurement, a process adjustment is
necessary. This adjustment requires establishing and changing vessel levels.
If process material is not available, you may use water in most cases.
Do not remove the lock on the source holder.
Notify your Radiation Safety Officer or contact VEGA Americas Field
Service if there is damage to the source holder.
Commissioning a source holder is performed only by a specific
licensed individual trained in radiation safety.
See the Radiation Safety Manual for specific details.
!
NOTE
!
NOTE