GFV Cabinet, set Y home adjustments.
WORK CONTENTS : GFV Cabinet Prerequisites.
STEPS: (1) Before powering on the Cabinet or shutting the door verify the following:
(1a) Door Ramp must be installed.
(1b) All Trays must be installed and seated. Reflectors must be on all outside trays.
(1c) Adjust latches on the Cabinet before shutting the door.
(1d) Verify that when the door is closed that the hand assembly clears the bulkhead.
(1e) Top of Door should be level with Cabinet top.
(1f) X-Rail must be installed and level with the shelves.
(1g) Power box must be installed.
(1h) Y-Rail stop on the hinge side; the adjustment screws should be loose and the bracket in the down position.
NOTE: For help and explanation of the diagnostics and Sensor Status display refer to the VUE 30/40 VEC 15 Programming Manual.