EasyManua.ls Logo

Vendo VUE 30 - Page 132

Vendo VUE 30
141 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GFV Cabinet, set Y home adjustments.
WORK CONTENTS : Powering on the Cabinet.
Note: .
STEPS: (1) Before connecting the Power Box to Line Voltage (VAC) make connections
from the door harness to the power box.
(2) Connect the Power Box to Line Voltage (VAC).
(2a) At power up the Cabinet should go through the following sequence:
The optic light should be on (red beam) on the hand assembly.
The display on the front of the machine should go through the boot sequence.
The hand should go to the home position, lower left hand in the door.
The delivery bucket and delivery flap will go through the boot up sequence, open / close.
Light
harness
Door
harness
Test Power
Optic red
light is
on(lit), and
the hand is in

Other manuals for Vendo VUE 30

Related product manuals