EasyManua.ls Logo

Ventis HE250 - Supply of Combustion Air

Ventis HE250
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
58 HE250 - Installation and Operation Manual
8.9 Installation Instructions for Masonry Application
WARNING: BEFORE STARTING THE INSTALLATION, THE MASONRY CHIMNEY MUST BE INSPECTED BY A
QUALIFIED SWEEP.
The following requirements must be respected:
1. The chimney must be absolutely clear of any soot residue or creosote. Check for cracks, loose or missing
bricks that could inhibit correct installation of the liner.
2. The clearance to combustible must be a minimum of 1" between the outside of the masonry and any
wood framing or loose insulation.
3. The chimney must be built in accordance with the current building code.
4. No other appliance can be connected to the same chimney.
Installation:
The chimney must be relined with a Forever Flex or Hybrid stainless steel liner of the same diameter as
the outlet of the fireplace. Only a connection at 30
°
or 45° angle is allowed. A special connector (B) must
be used to connect the liner (C) to the insulated chimney (A).

Table of Contents

Related product manuals