1. Position the supplied installation
template on the wall.
2. Mark out the rawl plug holes.
3.
Drill 7 10 mm holes for rawl plugs.
Insert the rawl plugs supplied.
4. Fit the wall mounting bracket with
the screws supplied.
Preparing the connections
!
Please note
To prevent appliance damage,
connect all pipework free of load
and torque stress.
1. Prepare the water connections.
Flush the heating system.
2. Prepare the gas connection.
3. Prepare the electrical connections.
■ A power cable 1.3 m long (out-
side of the boiler) with plug is
connected in the delivered condi-
tion: NYM-J 3 x 1.5 mm
2
■ Cables for accessories:
NYM-O 2-core min. 0.5 mm
2
or 2-
core cable for LV
Preparing for installation