For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps Page
• • •
1. Filling and venting the heating system........................ 34
•
2. Setting the time and date............................................... 37
•
3. Flue system correction factor setup............................. 38
•
4. Making the settings for operation with outside
temperature sensor or room temperature sensor....... 38
•
5. Activating/deactivating WLAN module......................... 39
•
6. Making the settings for operation with external
extension......................................................................... 40
•
7. Switching off DHW heating............................................ 41
•
8. Limiting the maximum heating output.......................... 42
• •
9. Checking the gas type.................................................... 42
• • •
10. Checking the static pressure and supply pressure.... 43
• • •
11. Checking the nozzle pressure, 18 kW........................... 44
• • •
12. Checking the nozzle pressure, 22 to 36 kW................. 49
•
13. Checking the balanced flue system for tightness
(annular gap check)........................................................ 52
• •
14. Draining the boiler.......................................................... 52
• •
15. Checking and cleaning the burner................................ 53
• • •
16. Checking the diaphragm expansion vessel and
system pressure............................................................. 53
• •
17. Checking and cleaning the flue gas heat exchanger.. 55
• •
18. Checking and adjusting the ignition and ionisation
electrodes........................................................................ 58
•
19. Flow limiter...................................................................... 59
• • •
20. Checking the safety valve function
• • •
21. Flue gas emissions test................................................. 59
• • •
22. Checking the ionisation current.................................... 60