33
Commissioning steps
Inspection steps
Maintenance steps Page
• • •
23. Checking all connections on the heating water and
DHW sides for leaks
• • •
24. Checking the flue system for unrestricted flow and
leaks
• • •
25. Checking the electrical connections for firm seating
• • •
26. Checking gas equipment for leaks at operating
pressure........................................................................... 61
•
27. Instructing the system user........................................... 61
Commissioning, inspection, maintenance
Steps - commissioning, inspection and…
(cont.)
5837146
Service