MR 700
43
Ed. 3 - 2012_11
English
COOLANT REPLACEMENT
Follow the procedure below.
1 -Start the engine and run it at minimum 
speed for a few minutes. The cooling 
circuit reaches the operating pressure.
2 -Turn off the engine and remove the 
ignition key.
3 -Let the engine cool down adequately to 
avoid being burnt.
4 -Prepare a container of appropriate 
capacity. As for the liquid quantity, see 
“Specications”.
5 -Open the cock (S).
6 -Unscrew the plug (S1).
7 -Let the liquid ow into the container.
8 -Close the cock (S).
9 -Screw again the plug (S1).
10 -Carry out the same operation on the 
cock (S2) as well.
11-Unscrew the plug (P).
12-Pour in the new liquid. The liquid level 
should be included between the mini-
mum and maximum notches printed on 
the expansion chamber. As for the liquid 
quantity and type, see “Specications”.
13 -Screw again the plug (P).
14 -Turn the engine on and leave it run-
ning at minimum speed for a few minutes 
until it reaches working speed (70÷80°C).
15 -Turn off the engine and let it cool 
down properly.
16 -Check the coolant level and, if neces-
sary, carry out topping-up (see “Engine 
coolant level check”).
cock (S)
cock (S2)
plug (S1)
 Important
Do not throw away any polluting 
material in the environment. Carry out 
their disposal in compliance with the 
relevant legislation in force.
load plug (P)