EasyManua.ls Logo

Wacker Neuson ET12 02

Wacker Neuson ET12 02
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7-16 BA ET18, 20, 24 en* 1.5 * et18_20_24w700.fm
7 Maintenance
2. Press bow clip B downward and hitch it.
3. Position lock D opposite notch B.
4. Press side cover C toward the machine with both hands until it
engages with an audible click.
5. Close the engine cover.
Cover on the right
Opening:
1. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
2. Unscrew both screws A.
3. Fold down the side cover.
4. Remove the side cover.
Closing:
1. Hitch the side cover on the lower side into both shackles B.
2. Raise the side cover.
3. Tighten both screws A.
Fuse box
Opening:
1. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
2. Open the cover on the left.
3. Slacken screws A and lower the cover.
Closing:
1. Install the cover and tighten screws A.
2. Close the side cover.
Fig. 238Hitching the side cover
B
C
D
Fig. 239Opening the cover on the right
A
Fig. 240Cover on the right
B
Fig. 241Open the fuse box
A

Table of Contents

Related product manuals