EasyManua.ls Logo

Wacker Neuson ET12 02

Wacker Neuson ET12 02
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7-42 BA ET18, 20, 24 en* 1.5 * et18_20_24w710.fm
7 Maintenance
Checking the hydraulic system for leaks
NOTICE
Leaks and damaged pressure lines must be immediately repaired or
replaced by a Wacker Neuson service center. This not only increases the
operating safety of the machine but also helps to protect the environment.
Leaks and damaged pressure lines must be immediately repaired or
replaced by an authorised service centre.
Have hydraulic hoses replaced every 6 years from the date of
manufacture, even if they do not seem to be damaged.
Do not operate the machine with leaking or damaged hydraulic system
components.
Use a piece of cardboard to diagnose the source of hydraulic leaks.
Retighten leaking threaded fittings and hose connections only when
the system is not under pressure. Release the pressure before working
on pressurized lines.
Never weld or solder damaged or leaking pressure lines and threaded
fittings, but have damaged parts replaced.
Wear protective equipment.
Do not search for leaks with your bare hands. Wear protective gloves
and search for hydraulic leaks with a piece of cardboard.

Table of Contents

Related product manuals