BA E14 track en* 1.3 * E14t_13_700.fm 7-7
Maintenance 7
Maintenance schedule of Lehnhoff mechanical quickhitch system
Other maintenance intervals (Wacker Neuson service center):
• Every 250 operating hours or semi-annually (MS03)
• Every 500 operating hours or annually (MS03)
• Every 500 operating hours or semi-annually (MS08/MS10)
• Every 1000 operating hours or annually (MS08/MS10)
For additional details contact a Wacker Neuson service center.
L
L
L
M
M
G
H H
Y
L
L
N
N
K
K
Symbolic representa-
tions
Quickhitch maintenance MS03/MS08/MS10 (operator) Interval
1
Perform visual inspection of the quickhitch system -- 10 hours of operation/daily
Clean bolt guide G 50 hours of operation/weekly
Clean the bolt contact surface H 50 hours of operation/weekly
Clean bottom side of the quick coupler system Y 50 hours of operation/weekly
Clean contact surfaces of the attachment K 50 hours of operation/weekly
Clean the opening for the socket wrench and bores of the attachment support L 50 hours of operation/weekly
Clean bolt attachment support M 50 hours of operation/weekly
Clean centering pins (only MS10) N 50 hours of operation/weekly
1. For time specifications: the first achieved time specification is decisive. If the situation requires it, perform maintenance if necessary, even if the maintenance
interval has not yet been reached.