EasyManua.ls Logo

Wacker Neuson ET65 - Page 94

Wacker Neuson ET65
356 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-26 BA E14 track en* 1.3 * E14t_13_400.fm
4 Putting into operation
3. Place the FOPS screen on the cabin roof.
E: mounting points for brackets B left and right.
4. Install screws F and tighten them to 45 Nm (33 ft.lbs).
G: mounting points at the front left and right.
5. Install screws H and lock nuts J and tighten to 110 Nm (81 ft.lbs.).
6. Put caps on all screws and nuts.
Information
If the vehicle is equipped with air-conditioning, point 2 does not apply. The
housing of the air-conditioning system is equipped with mounting
bushings for the rear screws.
A: housing version 1
B: housing version 2
Fig. 118Fig. 118
Fig. 119Fig. 119
E
F
Fig. 120
Fig. 120
G
H
Y
Fig. 121
Fig. 121
A
B

Table of Contents

Related product manuals