Assembly Instructions and Auxiliary Devices
Injection of antifreeze for the sprinkler
156
BA RD24_RD28 en us 06
Fill the piping system
16969
A
C
B A
B
1. Shut down the diesel engine.
2. Switch the sprinkler to spray nozzle control when the machine is at a
standstill.
3. Take the injection hose [A] out of its holder, and clean the end of the
hose if necessary.
4. Insert the injection hose into the container [C] containing antifreeze
solution.
5. Set the switchover valve [B] to antifreeze injection (lever horizontal).
6. Fill the piping system until the antifreeze solution exudes out of all the
spray nozzles.
7. Switch off the sprinkler.
8. Switch off the electrical system, and remove the ignition key.
9. Put the injection hose [A] back in its holder.
10. Set the switchover valve [B] to sprinkle (lever vertical).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson RD 24 and is the answer not in the manual?

Wacker Neuson RD 24 Specifications

General IconGeneral
BrandWacker Neuson
ModelRD 24
CategoryConstruction Equipment
LanguageEnglish

Related product manuals