75
PXM
P_02531
OPERATING AND ASSEMBLY MANUAL
VERSION 08/2015 ORDER NUMBER DOC2350372
4. Remove the cover from the box or tank.
Injector blowing out can only be started when the enabling signal from the application
controller is cleared (if the signal exchange was activated in the con guration
(Pro Tech M, Pro Tech S)).
Home page
Cleaning
Settings
Alarm
Worker
Injector
On
On
On
O
O
O
End
5. Boot the workstation by pressing the "Up arrow" button.
6. Remove the box from the box receptacle.
7. Move the injector device downwards by pressing the "Down arrow" button on the
blowout nozzles.
To do this, simultaneously press the safety switch for two-handed operation.
The "Blow out injector On" button is outlined in yellow.
8. Start injector cleaning by pressing the "Blow out injector On" button.
The subsequent cleaning procedure depends on whether or not the powder center
communicates with the application controller.
Both versions are described below.
On O
FP pump standard
On O
FP pump intensive
US Sieve
RP hose