EasyManua.ls Logo

Wareforce DG-E - INSTALLATION; INSPECTION; UNPACKING; LEVELING

Wareforce DG-E
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
07610-003-67-17-K
5
Before installing the unit, check packaging and machine for damage. Damaged
packaging might be an indication of damage to the machine. If there is any type
of damage to both packaging and unit, do not throw away the packaging. The
dishmachine has been inspected at the factory before shipping and is expected to
arrive in new, undamaged condition. However, rough handling by carriers or others
might result in damage to the unit while in transit. If this occurs, do not return the unit to
the manufacturer. Instead, contact the carrier and ask them to send a representative
to the site to inspect the damage and request that an inspection report be completed.
Contact the carrier within 48 hours of receiving the machine as well as the dealer that
sold you the unit.
The machine should be unpacked and removed from the pallet before installing. Open
the front door and remove all of the materials from inside. Once unpacked, verify there
are no missing parts. If a part is missing, contact the manufacturer immediately.
The dishmachine is designed to operate while level. This is important to prevent any
damage to the machine during operation and to ensure the best results possible.
The unit comes equipped with adjustable bullet feet which can be turned using a
pair of pliers. Verify the unit is level from front-to-back and side-to-side before
making any electrical or plumbing connections.
All plumbing connections must be made to adhere to local, state, territorial, and
national codes. The installing plumber is responsible for ensuring the incoming
water lines are ushed of debris before connecting to the machine. Note that chips
and materials from cutting processes can become lodged in the solenoid valves
and prevent them from opening or closing. Any valves that are found to be fouled
or defective because of foreign matter left in the water line, and any subsequent
damage, are not the responsibility of the manufacturer.
A water hardness test must be performed. If water hardness is higher than 5 GPG,
install a water softener or install the optional HTS-11 (scale prevention and corrosion
control). Please contact the manufacturer to purchase the HTS-11.
INSTRUCTIONS
INSTALLATION
INSPECTION
LEVELING
UNPACKING
PLUMBING
Do not throw away
packaging if damage is
evident!
A water hardness test
must be performed.
The plumber must ush
the incoming water line!
!
CAUTION