EasyManua.ls Logo

Wareforce DG-E - OPERATION; PREPARATION; POWER UP; INITIAL START-UP

Wareforce DG-E
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
07610-003-67-17-K
9
INSTRUCTIONS
OPERATION
Before operating the unit, verify the following:
The strainers are clean and in place.
The drain stopper is installed.
Wash/rinse arms are screwed securely into place and end-caps are tight.
Wash/rinse arms rotate freely.
To energize the unit, turn on the power at the service breaker. The voltage should
have been previously veried as correct. If not, the voltage must be veried before
energizing the unit.
Before the heater element can be energized, the booster tank must be initially lled
with water.
1. Press and hold the FILL button until water overows into the wash strainer, then
release the button.
2. The booster tank is now lled with water.
3. Turn off the unit by pressing the ON/OFF button.
PREPARATION
POWER UP
INITIAL
START-UP
CAUTION: Damage to
the heater element will
occur if the element is not
submerged in water.
!
CAUTION