EasyManua.ls Logo

Wareforce DG-E - Page 2

Wareforce DG-E
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Revision
Letter
Revision
Date
Made by Applicable ECNs Details
A 3-5-09 RC N/A Release to Production.
10 8-20-09 ARL QOF-339 Updated programming page diagram.
B 6-9-10 RC 100609-1502-
CW
Removed warranty registration information.
C 5-22-12 RC QOF-386 Updated schematic to reect wiring change at door switch.
D 3-11-13 RC QOF NDB-219 Updated company logo. Updated pump assembly page.
E 1-28-14 MHH QOF NDB-219 Added wiring change schematics.
F 3-19-14 MHH ECN 8293 Removed page on programming chemical feeder pumps.
Updated drawings for control box assembly, motor & pump assembly and
incoming plumbing assembly.
Added schematics and harness connections.
G 12-15-15 JH N/A Removed DG-D and all references to it.
Changed P/N 05330-100-01-10 to 05330-011-61-34, item #3
on pg. 32.
H 4-22-16 JH N/A Changed drain connection information to 2 1/2” and changed
NPT to “No Hub Connection” on pg. 2.
J 5-9-16 JH ECN 8380 Changed Booster Tank Assembly view and applicable P/Ns to
show thermostat change, pg. 32.
Added schematic 09905-003-36-56-E to show thermostat
change, pg. 37. Removed earlier versions.
Changed Harness Connections diagram to show thermostat
change, pg. 38.
K 1-5-17 JH N/A Updated to new manual format.
Audited and corrected all P/Ns in the manual.
REVISION HISTORY