8.3.2 Installation of High Level Balanced Flue (HLBF)
Installation instructions as per the balanced flue except there are no seals involved as
the flue is not telescopic. There are no extension pieces available for these units and
only 2 rearward facing options are recommended for the 90/120 range of boilers.
9.0 Installation of Boilers
9.1 Installation of 120/150 and 150/200 White Casings
Attach the casing tray to the boiler. Fix the casing bracket to the boiler, the control
panel securing bracket is fixed to the casing bracket. Attach the side casings to the
tray and casing bracket. Fit the rear casing then fit the control panel (or thermostat)
and clip on the front and top panel.
FRONT
CASING
GOLDBIRD
CONTROL
PANEL
WHITEBIRD
CONTROL
THERMOSTAT
MAIN CASING
BRACKET
GOLDBIRD
CONTROL PANEL
SECURING BRACKET
CASING TRAY
RH SIDE
CASING
REAR
CASING
LH SIDE
CASING
Page 27

Table of Contents

Other manuals for WarmFlow 70/90

Related product manuals