Basic Commissioning
• Linkage configuration: Z1-axis and Z2-axis can be active at the same time.
• Alternative configuration: Only Z1-axis or Z2-axis can be active at one time.
See Select Z-axis for details.
General Three-Axis Software
Use the software for normal machine tools with X-axis, Y-axis and Z-axis.
Functions such as “Axis Selection” and “Set Tool No.” are absent here.
Basic Commissioning
Before machining, you need to conduct commissioning to the tool machine and set motion
control system.
After the system is correctly connected and powered on, you can start commissioning according
to the following steps:
Table 1: Overview of Basic Commissioning Process Before Machining
Step Operation Reference
1 According to driver’s brand used, set station
address and adjust servo gain for the driver.
Execute Auto Adjustment
2 Check port information, detect status and wiring of
machine tool and adjust port polarity.
Check and Modify Port
3 Adjust axis direction. Adjust Axis Direction
4 Return to machine origin. Return to Machine Origin
5 Move machine tool and set related parameters.
Modify Parameters
NK280B Parameter
Reference
6 Set workpiece coordinate system (WCS), including
workpiece offset and public offset.
Set Workpiece Coordinate
Commissioning finishes. Wait for machining.
Switch Operating Language
At present, Simplified Chinese and English are available.
To switch operating language in use:
1. Press System > C to open System Info interface.
2. Press F3 to choose target language.
3. Restart the software.
The target language takes effect.
12