Installation and operating instruction
Oil burner WL20/2-C Z
3 Product description
83307702 1/2019-04 La
13-80
B1 Flame sensor TNZ Post-purge time: 6.5 s
B15 Temperature or pressure regulator TS Safety time: 4.6 s
B16 Temperature or pressure regulator stage2 TVK Residence time partial load (stage1): min5s
F2 Temperature or pressure limiter TV Pre-purge time: 16.2 s
K10 Anti siphon valve (optional) Voltage is applied
K11 Stage1 solenoid valve Flame signal present
K13 Stage2 solenoid valve Current path
M1 Burner motor START (orange)
M20 Air damper actuator Ignition phase (flashing orange)
P11 Control lamp operation (optional) Burner operation (green)
P13 Control lamp stage2 (optional) 1 CLOSED position (ST0)
T1 Ignition unit 2 Stage1(ST1)
TW Startup waiting time: 1 s 3 Stage2 solenoid valve (MV2-Oil)
TN Post-purge time: 1.2 s 4 Stage 2 (ST2)