25
7 Assembly, rst start-up
7.1 Safety
Toensurethesafetyofmanandmachineeasyand
risk-minimisedinstallation/handlingwastakeninto
considerationduringconstruction.Thus,thehandling
machineissubjecttoallapplicableDINENstandards.
Operatortrainingandinstructionarerequiredandfur
therreducethesafetyrisk.
7.2 Assembly
Thecompleteassemblyandrststart-upiscarriedoutexclusivelybythe
manufacturer.Themachinesaresubjectedtoathoroughtestrunandare
suppliedonlyaftersuccessfulacceptance.
7.3 First start-up
Beforerststart-up,checktheentirevehiclefor
possibledamage.
NOTICE
NOTICE