EasyManua.ls Logo

Wolf CGB-2-24 - Page 55

Wolf CGB-2-24
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3064810_201804 55
Rotary joint threaded connection
Fig: Threaded connection of rotary joint
Fillingthetrap
Prior to opening the gas ball valve and acknowledging
the fault:
Remove the trap.
Fill the trap with water up to the mark.
• Retthetrap.
Open the gas ball valve and acknowledge the fault.
Switch ON the condensing boiler at the red ON/OFF
switch in the WOLF logo.
Note:
The condensate hose attached to the trap must not form
a loop or roll up, as this could lead to impaired operation.
Trap
Fig: Trap
25.Fillingtheheatingsystem/trap
When installing an automatic vent, lock the
lower threaded connection of the rotary joint
underneaththecombustionchamberoor.
Check the system pressure again and top up with
water if required.
Note:
During continuous operation, the heating circuit is auto-
maticallyventedviathehighefciencypump.
Please
note

Other manuals for Wolf CGB-2-24

Related product manuals