EasyManua.ls Logo

wtw Cond 7310 - 3 Commissioning; 3.3 Initial Commissioning

wtw Cond 7310
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning Cond 7310
10 ba75933e04 06/2013
3 Commissioning
3.1 Scope of delivery
Conductivity meter Cond 7310
4 batteries 1.5 V Mignon type AA
Power pack
USB cable
Stand
Stand holder
Comprehensive operating manual
Short instructions
CD-ROM with
USB drivers
comprehensive operating manual
software MultiLab Importer
3.2 Power supply
The Cond 7310 is supplied with power in the following ways:
Mains operation with the supplied power pack.
Battery operation (4 x alkaline manganese batteries, type AA)
USB operation via a connected USB-B cable.
3.3 Initial commissioning
Perform the following activities:
Insert the supplied batteries
For mains operation: Connect the power pack
If necessary, mount the stand
Switch on the meter (see section 4.2 S
WITCHING ON THE METER, page 15)
Set the date and time (see section 4.4.5 E
XAMPLE 2 ON NAVIGATION: SETTING
THE DATE AND TIME, page 20)

Table of Contents

Related product manuals