34
TGC65-MT/UT/ET (Unit: mm)
Download
PLC
24V 0V FG
1 2 3 4
PWR
410.0
270.0
65.0
395.0
255.0
56.5
399.0
259.0
3-4-2 Installation and using environment
Install requirements:
TG has four ferric mounting racks when out of factory, there are two square holes on the
up, down side of TG, use mounting rack to fix the TG with control cabinet.
In order to avoid TG temperature too high after long time working, please keep 10cm
space on the up/down and 5cm on the left/right side of the TG when installing.
Install steps:
1. Refer to the dimension in the former chapter to open a rectangle mounting hole in
the control cabinet;
2. Add airproof circles in the airproof slot when installing;
3. Insert the bottom of TH into the mounting hole of control cabinet;
Fixed bracket
Install panel

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Xinje TP Series and is the answer not in the manual?

Xinje TP Series Specifications

General IconGeneral
BrandXinje
ModelTP Series
CategoryTouch Panel
LanguageEnglish

Related product manuals