JOHNSON CONTROLS
90
SECTION 5 - TECHNICAL DATA
Form 201.28-NM1.1
Issue date: 08/06/2021
Elastomeric isolator installation
Read the following instructions before beginning
installation.
1. Isolators are shipped fully assembled and are to be
positioned in accordance with the submittal draw-
ings or as otherwise recommended.
2. -
base, ensuring that all isolators lines match the
equipment mounting holes. The VMC group
recommends that the isolator base (A) be installed
on a level surface. Shim or grout as required,
leveling all isolator bases to the same elevation
tolerated).
3. Bolt or anchor all isolators to supporting structure
utilizing base thru holes (B).
4. Remove top bolt and top washer. Place equip-
ment on top of isolators so that mounting holes in
equipment or base line up with threaded hole (C).
5. Reinstall top bolt and washer and tighten down.
LD13762C
D
D
C
L
C
L
(B)
(B)
(A)
(C)
Top bolt
Top washer
Section D-D