EasyManua.ls Logo

Yueming CMA1325C-B-A - Preparation for Installation; Machine Level Adjustment

Yueming CMA1325C-B-A
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
Spare parts and accessories
Please confirm that the equipment model is the one you ordered, open the auxiliary chassis and laser tube
crate, check if any part is missing or doesn’t match according to the packing list, and check the accessories for
damage and deformation.
Attention
Do not unpack the crate without permission.
To unpack, first obtain permission from customer service or business personnel of Han's Yueming Laser, or else the
company doesn’t assume any responsibility for any accidents.
Attention
If any problem occurs after unpacking, please inform the customer service or business personnel of Han's Yueming
Laser, or directly call Han's Yueming Laser. Do not handle without authorization.
3.1.3 Preparation for installation
Site
The dimensions of CMA1325C-B-A machine body are3480*1900*1150mm; to ensure the normal
use of the machine, ensure that the machine's working space is at least 4000*3000*4000mm;
Laser equipment has requirements on site conditions and working environment; please confirm
that if the site is appropriate in accordance with section 1.3 and the requirements of our company.
Staff
The installation personnel are professional service commissioner of Han's Yueming or operating personnel of
agents trained by Han's Yueming. To install the machine independently, the client must have accepted full
installation training by Han's Yueming Laser and have master the points of installation of laser-related equipment.
Tools
According to the order requirements, related installation tools may be provided. If the user does not have
such requirement, it may be necessary to provide the installation and testing tools, such as hex wrench,
screwdriver, multimeter, and wrench.
Others
The user needs to prepare 0.8MP high-pressure gas source, water, 220V power supply, exhaust channels,
proofing materials and electrical outlets related to the equipment.
Attention
While the service commissioner is installing, the client must accompany throughout. Equipment installation and
commissioning are part of the training, and the user needs to master.
3.1.4 Machine level adjustment
After the machine is moved to the workplace from the crate, please re-adjust the level of the machine as
follows due to differences in the workplace:
First adjust the six foot cups of the machine to make it completely hold up the machine;
Then, remove the screws in the middle of the Y axis organ cover and crossbeam organ cover, and slide
the organ covers to both ends;

Table of Contents

Related product manuals