Identification: MD-AL-GI-00
Rev. 1.2 07.06.21 - Application: GID
Figure 52 - Configuration of system with Connext (2)
The system configuration must be indicated, whether single-phase or three-phase. IMPORTANT: do
not indicate whether it is a single-phase or three-phase inverter, but the system.
The location of the system allows for correct weather and time data.
Figure 53 - Verification of Connext registration