EasyManua.ls Logo

ZCS AZZURRO CONNEXT User Manual

Default Icon
67 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Identification: MD
-AL-GI-00
Rev. 1.2 of 24/06/21
- Application: GID
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
innovation@zcscompany.com - zcs@pec.it - zcsazzurro.com
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Company Reg. no. 03225010481 - REA AR no. 94189
ISO 9001 Certified Company - Certificate no. 9151 - CNS0 - IT-17778
“Connext System User Manual” of 10/01/2023 Rev. 2.2
“CONNEXT” Control System
User Manual
Question and Answer IconNeed help?

Do you have a question about the ZCS AZZURRO CONNEXT and is the answer not in the manual?

ZCS AZZURRO CONNEXT Specifications

General IconGeneral
BrandZCS
ModelAZZURRO CONNEXT
CategoryControl Systems
LanguageEnglish

Summary

CONNEXT Control System User Manual

Preliminary Safety Instructions

Safety Instructions

Highlights crucial safety guidelines for equipment installation and use.

Qualified Personnel

Specifies the necessary qualifications and responsibilities for personnel.

Installation Requirements

Details the prerequisites and conditions for system installation.

Transport and Electrical Requirements

Operation

Safety Warnings

Lists critical warnings related to product operation and potential hazards.

Maintenance and Repair

Product Features

Product Presentation

Introduces the Connext system's capabilities and communication features.

Installation

Checks Before Installation

Covers checks on packaging and product integrity before installation.

Checking the Outer Packaging

Procedure for inspecting outer packaging for transport damage.

Checking the Product

Procedure for verifying the product's condition after unpacking.

Electrical Connections

Detailed steps and precautions for making electrical connections.

Connecting to Azzurro EV Charging Stations

Connecting the 8-pin Cable

Instructions for connecting the Connext system to EV charging stations.

Systems with ZCS Azzurro Inverter

Configuration 1: Single-Phase Hybrid Inverter

Details for connecting a single-phase hybrid inverter system.

Configuration 2: Azzurro 3000SP Inverter

Details for connecting the Azzurro 3000SP inverter system.

Configuration 3: Three-Phase Hybrid Inverter

Details for connecting a three-phase hybrid inverter system.

Configuration 4: Single-Phase Photovoltaic Inverter

Details for connecting a single-phase photovoltaic inverter system.

Configuration 5: Three-Phase Photovoltaic Inverter

Details for connecting a three-phase photovoltaic inverter system.

Systems Without ZCS Azzurro Inverters

Configuration 6: Single-Phase Photovoltaic Production

Setup for single-phase PV production without Azzurro inverters.

Configuration 7: Three-Phase Photovoltaic Production

Setup for three-phase PV production without Azzurro inverters.

Configuration 8: Single-Phase System Without Photovoltaic Production

Setup for single-phase systems without PV production.

Initial System Configuration

Creating an Account on the Azzurro Systems App

Steps for creating a user account on the Azzurro Systems mobile app.

Adding Devices

Adding an Azzurro Inverter

Instructions for adding an Azzurro inverter to the system.

Adding Measuring Systems

Guide for adding external sensors or meters to the system.

Adding and Managing Wallboxes

Steps for registering and managing wallbox devices.

Charging Strategies

Dry Contact Management

Access for Maintenance Only

Technical Datasheet