802742UK - G4 IS IT industrial installation instructions - Jan. 2016 - V2.03 Page 27 of 32
To calibrate, touch START button
NEXT
03:01 PM, TUE 12, Feb 2013
Boiling Chilled
Zip
START
Empty / Filling
Pulses/L (360 - 440)
5.3 Flow calibration
Commissioning
• Press the [MENU] button for main menu.
• Press the [Install] button.
• Press the [Boost] button.
• In the next screen, select [YES] to enable the booster.
• Before connecting the power to the booster, water
must be run through for a min. of 30 seconds to purge.
Run the boiling tap for 30 seconds and the allow the
tank to refill.
• Dispense boiling water for 30 seconds and check the
booster outlet hose is warm when the boiling water
tank is replenishing.
Note Foranysubsequentlterchangesoranyoperationalprocedures,pleaserefertotheuserguide,
locatedinsidethelterhousingaccessdoor.
5.5 To enable a booster, when installed.
•
Press the [Calibrate] button and the system will
start the boiling calibration procedure. This will
take approx. 5 to 6 minutes.
5.4 Boiling calibration
Note Depending on your location you may need to reset the internal clock. See section G of the user guide to
reset the date and time.
• Press the [START] button and the tank will first empty then
fill. Upon completion the pulse count will be displayed.
• Check the value is within limits.
• Press [NEXT] for the boiling calibration screen.