802742UK - G4 IS IT industrial installation instructions - Jan. 2016 - V2.03 Page 13 of 32
Section 2
Ventilation
Important See section 4 Command-Centre
TM
installation,
pages 23 to 25.
Vent cut-out details
A Air outlet vent
B Air inlet vent
A
B
C
C Ducted vent
When installing air flow vents, the following tools will be required
•
Jigsaw and drill.
•
Keyhole or wall board saw.
Preferred ventilation arrangement shown below.
The ducted vent kit supplied with the Command-Centre
TM
exhausting through the kick-space should be used,
to provide adequate ventilation in all conditions. (Ancillary components are not shown in these diagrams).