Page 4 of 32 802742UK - G4 IS IT industrial installation instructions - Jan 2016 - V2.03
Before installation
• Read the instructions and check if there is adequate space to install all of the components.
• Note Not all fittings are supplied with the appliance kit. Isolation valves are not supplied.
• Check the mains water pressure is within min / max requirements (see page 9).
• Check the water quality to determine if extra filtration will be required.
• Note This product must be fitted to a potable water supply.
• Check the Command-Centre
TM
rating plate and ensure correct power is available.
• Check the under counter cupboard floor supporting the Command-Centre
TM
is adequate for its
total weight, when full of water.
Before commissioning
• Check the system has been installed correctly.
• Check all plumbing fittings have been tightened.
• Ensure the outlet and vent pipes are positioned to drain correctly.
• Ensure there is adequate ventilation.
• Check all tubes and pipes from the Command-Centre
TM
to the tap have a constant rise and there
are no sags or kinks in the hoses.
• Check all electrical connections are correct and there are no loose wires.
Commission (see section 5)
• Flush the supply line before connecting.
• Turn on the water and check for leaks.
• Flush the filter(s).
• Activate / enable the booster (if fitted).
• Where applicable, programme the Command-Centre
TM
to suit the customer’s requirements.
Installation checklist