17
Atlas Bio Series Access Control Panels Installation Guide
Copyright©2020 ZKTeco USA. All rights reserved.
5.1 INSTALLATION OF PANEL & CABINET
COMM
AUX LED
RUN
GND
PWR
NC
LOCK1
COM
NO
SEN
GND
BUT
NC
LOCK2
COM
NO
SEN
GND
BUT
NC
LOCK4
COM
NO
SEN
GND
BUT
NC
LOCK3
COM
NO
SEN
GND
BUT
+12V
RS485
READER
GND
485B
485A
+12V
READER1
GND
D0
D1
RETURN
GLED
RLED
BEEP
HOLD
SHIELD
+12V
READER2
GND
D0
D1
RETURN
GLED
RLED
BEEP
HOLD
SHIELD
485A
PC
485B
GND
NC
AUX OUT
COM
NO
AUX1
AUX IN
GND
AUX2
BREAK
POW DET
GND
AC FAIL
BAT FAIL
+12V
POWER
GND
+12V
READER3
GND
D0
D1
RETURN
GLED
RLED
BEEP
HOLD
SHIELD
+12V
READER4
GND
D0
D1
RETURN
GLED
RLED
BEEP
HOLD
SHIELD
PWR
RUN
COMM1
COMM2
WLAN
DOOR
0
1
2
3
4
5
6
7
8
9
A
B
C
D
E
F
Cable Conduit
(Punch hole for cables)
Atlas x60 Panel
Heat Dissipation Grill
Mounting HolesState Indicators
We recommend drilling the mounting plate screws into solid wood base (i.e. stud/beam). If a stud/beam cannot be
found, then use the supplied Spacer (anchors). Wiring methods shall be in accordance with National Electrical Code,
ANSI/NFPA 70. Do Not Connect to a Receptacle controlled by a Switch.
5. Installation Setup
Step 1
Drill Holes according to the
Cabinet Holes
Step 2
Mount the cabinet using screws
Step 3
Screw the Panel inside the
cabinet