RT60 Rough Terrain Crane 07 - 9
ENGAGING THE PTO
a) Turn on the shutoff gate valve of the hydraulic oil tank;
Turn the handle of the shutoff gate valve on
the hydraulic oil tank in the direction shown in
the left figure to connect the hydraulic oil tank
and the oil lines.
The hydraulic system may be damaged
seriously if the shutoff gate valve is closed.
Fig. 07 - 1
b) Engage the PTO;
Fig. 07 - 2
The PTO handle is located near the turntable.
Pull the handle upwards to engage the PTO.
In winter, run the engine without load for 15 – 20 minutes before lifting operation.
DISENGAGING THE PTO
a) Disengage the PTO
Fig. 07 - 3
Push down the PTO handle to disengage the
PTO.