EasyManuals Logo

Zoomlion RT60 User Manual

Default Icon
173 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #103 background imageLoading...
Page #103 background image
07 - 8 RT60 Rough Terrain Crane
7. 10 TOWING
The tow coupling may be damaged when towing the vehicle with the tow coupling at
high speed suddenly.
If the vehicle is to be towed, it will be necessary to run the engine at idle speed to lubricate
the transmission clutches, and disconnect the drive shafts for front and rear axles.
If the engine cannot be run, the vehicle is not permitted to be towed.
7. 11 PTO OPERATION
The function of PTO is to transmit engine power to the oil pump to carry out various
movements via hydraulic system.
POINTS FOR ATTENTION BEFORE OPEARTION:
Ensure the follow prerequisites are met before engaging the PTO:
a) Engine must be turned off;
b) The joysticks in the cab should be set in neutral position;
c) The outrigger switches should be placed in neutral position;
d) The transmission shift lever should be moved to neutral position;
e) The parking brake of chassis should be activated.
Warning
Caution

Other manuals for Zoomlion RT60

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zoomlion RT60 and is the answer not in the manual?

Zoomlion RT60 Specifications

General IconGeneral
BrandZoomlion
ModelRT60
CategoryConstruction Equipment
LanguageEnglish

Related product manuals