RT60 Rough Terrain Crane 07 - 31
7. 17 SIMULTANEOUS CRANE MOVEMENTS
The simultaneous crane movements, which can greatly improve the working efficiency,
refer to that the crane can use more than one function at a time.
Before initiate crane simultaneous movements, you should:
a) Not attempt to move the joysticks to their limit positions.
b) Depress throttle pedal.
c) Take maximum care to avoid accident.
The crane offers 9 simultaneous crane movements.
Simultaneous crane movements can only be carried out without load or when the
load has been lifted away from the ground. DO NOT EXTEND / RETRACT THE BOOM
WITH LOAD.