Ascotel® IntelliGate® 150/300 as of I7.9
Installation 63
syd-0210/1.7 – I7.9 – 12.2009
4. 2. 5. 2 Drilling plan
The system is suspended into two premounted wall screws using the suspension
points in the housing base. Depending on the type of mounting, these are the sus-
pension points marked under position A or B on the drilling plan. The system is se-
cured with a third screw to prevent it from being dislodged accidentally
(position C).
All dimensions in mm
Fig. 18 Drilling plan for A150/300 wall mounting
!
!
"
"
#