Operation Manual / 4 Product description / A130-H.. - A140-H..
Periodic maintenance work
Page 53 /
© Copyright 2015 ABB. All rights reserved.
Figure 23: Carrying out wet cleaning of turbines
Fulfil prerequisites.
Ensure that the water supply (01) is guaranteed.
Open the stop valve (02) and set the water volume flow V
W
with a flowmeter (03) (see
cleaning parameters).
Close the stop valve (02) after 10 minutes.
Wait for 10 minutes; do not change the load during this stabilisation phase.
If the cleaning result is unsatisfactory or there is water leakage, contact an ABB
Turbocharging Service Station.
Temperature before
turbine before
cleaning [°C]
Maximum
temperature before
turbine during
cleaning [°C]
Water volume flow
V
W
[dm
3
/min]
1)
A130 350 ... 430 530 4.0 10
A140 350 ... 430 530 8.5 10
Table 14: Wet cleaning of turbines, parameters
1)
Corresponds to a water pressure p
WT
of 1.5 bar (overpressure compared to atmosphere)