EasyManua.ls Logo

ABB A170-M Series - Fig. 56: Installing the Cartridge Group 2; Fig. 57: Installing the Cartridge Group 3; Table 40: Tightening Torque (61059; 42128)

ABB A170-M Series
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / A170-M.. - A175-M..
9 Disassembly and assembly / 9.9 Installing the cartridge group
© Copyright 2022 ABB. All rights reserved. HZTL4033_EN Rev.K January 2022
Fig.56: Installing the cartridge group 2
Product Size Tightening torque [Nm]
A170-M M22 400
A175-M M24 490
Table40: Tightening torque (61059 / 42128)
1. Coat thread of screw (61059) and two bolts for the nuts (42128) with high-temperature
grease.
2. Secure cartridge group with screw (61059) and nuts (42128).
3. Remove the lifting gear.
Fig.57: Installing the cartridge group 3
Page 100 / 146

Table of Contents

Other manuals for ABB A170-M Series

Related product manuals